… and there was light and it was good …

2016 03 25_LightValetTemp3… and there was light and it was good …

 

One of the few missing items that will allow the use of the Aquarius Valet Deck and its Lobby were the lights. The City of Hollywood demanded to install lights with less lumens than the previous plan had specified. A Temporary Certificate of Occupancy (TCO) was granted with the installation of temporary lights up to the installation of the permanent lights that are in back-order.

After this TCO the General Contractor CSI will be able to ask the City of Hollywood to close the permit and allow the normal use of the Valet Deck. There are still a few items in the permit of the Lobby. It is expected that those will have a quick resolution. Closing the permits of the Valet Deck and the Lobby life in Aquarius will be back to a greater degree of normalcy the everyone aspires and deserves.

Cross your fingers everybody!

2016 03 25_LightValetTemp4

2016 03 25_LightValetTemp1

2016 03 25_LightValetTemp2

.o0o.o0o.

Posted in Construction & 50 & 40 Year Recertifications, Pictures | Tagged , , , , , | Leave a comment

Aquarius apartment sells for $789,000.00

AQUARIUS-3D logo

Aquarius apartment sells for $789,000.00

 

In December of 2011 this unit Penthouse S 4 was sold by $ 460,000.00. In September of 2015 the same unit was sold by $ 789,000.00 according to the Broward Conty Property Appraiser. The transactions history of this unit are posted in the Property Appraiser site. Click HERE to see the history.

Presently (March of 2016) there are about 20 apartments for sale at Aquarius. On the top bar of this site there is a tab For Sale where offered units are presented. This For Sale post presents several Real Estate websites that are continuously updated. These sites were carefully chosen because they are usually accurate, do not require email, telephone or any identification data  from the reader. Several of the offered units have higher price tags than the unit mentioned above.

Considering the several services and amenities that will be offered the value of the properties tends to increase. It is important to consider that the sale of this unit happened when the reconstruction of the Valet Deck and Lobby where in their early stages. Now that a few details remain to be ironed out it is possible to see what will be suit reality.

It is expected that the main entrance using the Valet Deck and the Lobby will be open very soon. In addition several amenities are already ready or soon to be available. These are:

  • Book Exchange (Library),
  • Multimedia Room with large 4K TV set,
  • High speed internet in many common areas,
  • Wet Bar for intimate functions,
  • 2 Swimming Pools – with sun from sunrise to sunset,
  • Gym with a great variety of equipment,
  • Restaurant,
  • Beauty Parlor,
  • Storage Room,
  • Billiards and Cards Room,
  • Laundry,
  • 24/7 Security,
  • Valet service,
  • Two ample party or meeting rooms – Cascade and Aquarius Rooms
  • CCTV Surveillance Cameras covering many areas of the property

All these with private access to a remarkable beach at the balmy Southern Florida.

If you are away you may want to see the public cameras that show real time what the idyllic surroundings of this extraordinary complex. For the several live cameras  click HERE of click on the top banner of this site Southeast Florida Live Cameras.

.o0o.o0o.o0o.

Posted in Amenities, Pictures | Tagged , , , , | Leave a comment

What is going on at Aquarius – Report March 24, 2016

LOGO LOVEWhat is going on at Aquarius – Report March 24, 2016

 

Victor Rocha

This is a progress report regarding the valet deck and the lobby. As you can see, the lobby is almost completely finished. The bathrooms need to still pass the plumbing inspection which should be any day now. The contractor installed the floor to ceiling mirrors and we had him replace them because they were originally of sub-standard quality. We have to stain the back side of the desk to match the front. The previous Board thought it to be penny wise not to stain the back of the desk. it looks horrible the way it is so now we have to stain the back of the desk to match the front.

Carpet is being laid down in the green room. Baseboards need to be installed in the board room, bar and kitchen.

Our security cameras are up and running with 24 cameras so far.  Today we viewed the monitor which will be placed at the front desk. While we have a large portion of the property under surveillance, there are gaps that must be filled in to provide adequate security to our community. More to come on this later.

Judith Ort is doing a wonderful job with respect finishing the lobby and the furniture that will be placed there.

As to parking on the Valet Deck, unfortunately, our contractor ordered lights that were too bright for the City of Hollywood regarding the nesting of sea turtles on our beach. Consequently, the contractor is putting up temporary lighting so that we can get a temporary certificate of occupancy  (TCO) so that we could start parking there hopefully some time next week. Shortly thereafter, the new lights should be in from the distributor and we can finish the valet deck parking lighting and close out the permit.

Our hope is to have all of this done before the end of March.

Victor E. Rocha, P.A., Treasurer of the Bord of Directors of Aquarius

 

.o0o.o0o.o0o.

Posted in Board of Directors | Tagged , , , , , | Leave a comment

Aquarius Celebrates St. Patrick’s – March 19th. 2016

This gallery contains 26 photos.

Aquarius Celebrates St. Patrick’s   –   March 19th. 2016 Almost 100 Aquarians got together to celebrate St. Patrick’s day. Good food with good company. Little by little the spirit of Aquarius returns. Participate! Click in any picture to start … Continue reading

More Galleries | Tagged , , , , | 1 Comment

Aquarius Board of Directors Meeting of March 17, 2016 Minutes

LOGO WATERAquarius Board of Directors Meeting of

March 17, 2016 Minutes

 

 

With Bhagwan (Buck) Gupta, Cecilio Berndsen, Linda Satz, and Sofia Ferenburg present the meeting was called to order at 7:03 PM. Victor Rocha joined at 7:23 PM.

Date for the prior meeting minutes was incorrect Linda Satz approved to have the date changed to state February 18, 2016.

President’s Report with 14 items presented:

1) Office Phone system

2) Scheduling of Contractors – regarding extending their time from 4pm to 5pm;

3) Lobby area bathroom progress

4) Chandlers in the lobby – Finished waiting on light bulbs

5) Ceiling in the Greenroom has been repaired

6) A/C Billiard room improvements proposal was approved

7) The Board chose (3) 40 yrs. inspection companies to speak to unit  owners to decide which company will be used- Cecilio Berndsen  abstain from voting

8) Engineering Proposal – renovate Gym roof was reviewed and ratified;

9) Painting the walls of 2nd Floor corridors were under considered

10) Traffic safety Pillars mirrors to be installed

11) Electric Contractors valet deck – The lights proposed for valet  deck were giving off too much light and City is requesting for them to be replaced before permit is closed

12) Old water pipe- Heater East Pool – Contractors working to repair;

13) Elevator Service Company (2 way communication fixed)

14) Cameras Phase I has been completed Phase II we will be getting a price for this shortly

Motion: To have three 40 yr. inspection companies to present on April 5, 2016. Bhagwan Gupta wants the three 40 yr. inspection companies as follows (M2E, Hillman and Structure & Design) to present at the Budget Meeting being held on April 5, 2016. Victor Rocha seconded the motion. Vote was 4-1, Cecilio Berndsen abstained.

Parking Questions: FOBs, Valet tickets, Stickers

Restaurant Lease Issues:

– Shlomo, present concession holder is trying to get out of his contract. Trying to get money from the potential new renter. Board has to agree on the contract terms subletting his lease. He is allowed to sell his property but he should not sell Aquarius Condo property.

Motion: To allow Shlomo to break the lease. Cecilio agrees that Shlomo may break the lease without any onus for him the renter or the Aquarius Cond. Association. Linda Satz seconded the motion. Motion carried with 5 votes.

Operation Project Update:

Pineda Lawn Services- Planters, irragation system

Housekeeping ASI – Discuss with them to go over what they will be responsible for once it’s all done.

Vice President- Cecilio Berndsen pointed out many areas of the property do not have a regular cleaning. For example the amount of trash in the Storage rooms remains there for months. Sand, debris and trash are kept in the al decks and garage. He has made a request of regular schedule for cleaning these areas as well as cultivation of all plants in all common areas. Atlantic Pacific the management company promise offer such schedule.

Linda s.:  Changing the battery for alarm black box in air conditioner room. This seems to be an issue of individual owners not the Aquarius Condo.  Association. There was a suggestion to change the batteries when air filters of air conditioning are changed. Another suggestion: making a video to show how to change the battery and yet to hire another maintenance individual. There was no vote on this issue.

Update: Pool Heater Company will be here on 3/18/2016.

Aquarius 7 elevators that are up for 5 year inspection. Aug 2015 – Elevator inspection certification expired. Motion: To have a company come in and inspect the elevator. Victor proposed a 3 year contract with a private company to perform the inspection so a discount is obtained.    Linda Satz seconded the motion. Motion carried.

In the Valet ACG, Engineering firm, says handicap railing is not necessary.

West Pool Deck: RV (plants vendor) – New  replacement plants have been placed in.

Lobby Renovation on 7th intercom wire telephone- were not operational

Doors & FOB readers

– Lobby Permit should be closed in a few days (next week)

– Valet Deck – Lighting needs to be completed.  – Contractors are going to ask the City of Hollywood if temp lighting could be used for final inspection.

Have maintenance look at all doors for repairs to locking mechanism

Projected date for the A/C – 12 weeks time to receive equipment before it can be scheduled. Proposal to hire crane is expected from HVAC installer VMech.

Gym bathroom and Gym roof S&D Engineering to be hired to specifiy scope of work, conduct bid and supervise work.

On March 24, 2106 Forensic Auditor will present at the Town Hall

Meeting his finding of the work done on financial reports over 2009 to 2012.

Board Meeting Time: Motion to move every third Thursday of the month Board Meetings time to 6:30pm.  Motion carried. All in favor.

Motion to Adjourn: proposed by Victor, carried.

Meeting adjourned 8:45p.m.

Linda Satz, Director Secretary

Signs and submits.

.o0o.

Posted in Board of Directors | Tagged , , , | Leave a comment

What is going on at Aquarius? Quick update

AQUARIUS-3D logoThis is a quick update of what is going on at Aquarius.   

March 13, 2016

 

Lobby and nearby rooms

1. Lobby Chandeliers: in progress,  LED lights already shipped by vendor

2. Lobby Mirrors: should be replaced 3/16

3. Lobby Bathrooms: most work done. Natural stone for counters in progress

4. Lobby Concierge Desk: 25 Security Cameras being installed work to be finished 3/16

5. Lobby C. Desk: Cameras Phase 2 – on hold

6. Lobby C. Desk: Network operational (links Mgt. Office and Security booth at North Gate).

7. Access Control at Lobby C. Desk: Most FOB readers working, some work to be completed.

8. Transition to Galaxy Access Control FOBs under study (this will improve individuals getting to the building.

9. Intercom from doors to Lobby Con. Desk: work in progress

10. Sound system for Lobby and Cascade Room: Work to start after Valet Deck lighting completed 3/18.

11. Package Room (old library) shelves to installed.

12. Details of Dry Wall project: Inspection planned for 3/16

13. Carpet install on Green Room and Billiard Room: TBA

14. WIFI fully operational in areas next to Cascade Room(SSID is Aquarius24 or Aquarius5 – password with security. Password to be changed from time to time now it is aqua3333

15. WIFI under study to increase range of the network to pool decks. Antennas acquisition under consideration.

15. Library: Some books already in the shelves. volunteers – Maya B, Yvana B. and Tersesa M.- ask: Do you have books of general interest to donate? Please bring them and place them in the table at the Library. They will classify and shelf them.

16. Furniture and Decor: proposal to BOD in progress.

40 Year Re-certification Project

 

A cycle of 6 presentations with Engineering firms was completed. Next step is to create a short list of 2 or 3 firms to select the winner. This firm will help Aquarius fulfill its legal and safety obligation to have its structure and its electrical systems considered safe and sound. After this exercise the Law commands re certification exercises every 10 years.

Are we late? A bit but the work done at the Valet Deck and the West Pool Deck is a great advance toward the 40 year re certification responsibility.

Valet Deck

 

1. Lighting project to be completed 3/18

2. Closing permit of Valet Dec: CSI will ask City of Hollywood to close it  after Lighting project is done.

3. Some additional work after closing of permit. Drains.

4. Some issues with Comcast persist.

5. Numbers in cars spots in progress.

 

Garage:

 

1. Lighting project to start after completion of lights in the Valet Deck

2. Improving access to garage gate: New transponders ordered to replace some hesitation on the Gate.

3. Cleaning and power washing: TBA

 

GYM:

 

1. Repair of ruptured water line: under progress (some damage to Green Room ceiling happened.

2. Bathrooms renovation: under consideration, collecting proposals, no decision made.

3. Roof: BOD to hire SD Engineering to specify and supervise roofer to do the job

 

East Pool

 

1. Water line repair in progress

2. East Pool heating: temporary repair in progress

 

Plants in the 3 decks, front garden and West parking Lot:

 

1. Irrigation done by Maintenance Team

2. Cultivation, fertilization, pruning and general care: contact with Peneda (care taker of front garden and East Pool Deck) already scheduled.

 

Central Air Conditioning

 

1. City of Hollywood permit open

2. Compressors and other components ordered – 15 weeks lead time.

3. Consideration of hiring a Crane to speed installation of Central Unit in both towers.

4. Meeting with our Mechanical Engineer supervising Vmech (our contractor) to be scheduled soon.

5. Major problem at the water cooling pump (serves units air conditioners) solved last week. Now South Tower dwellers can have their unit’s operating.

 

Restaurant

Under study to concede concession to another restaurateur

 

Committees Work:

 

Information Committee:

Working in improving the Condominium Management Software System. Under study Vertilinc, AtHome and other software providers.Database requirements in study. The Wave Condominium was visited and presentations under way.

 

Legal Committee

Reviewing By Laws and Aquarius Condominium Rules and Regulations to make them more simple and comprehensible.

Beautification Committee

Working hard on Lobby details

Social Committee

Big party on March 19. Did you already get your green outfit ready?

__________________________________________

Do you want learn more?  Come to the Board of Directors meeting every third Thursday of the month. Next meeting March 17th., 2016

Do you want learn even more? Participate in a Committee. Construction Committee meets every Friday at 10:00. The meetings are open to all owners.

.o0o.

 

Posted in Committees, Construction & 50 & 40 Year Recertifications | Tagged , , , , , , | Leave a comment

Aquarius March Meetings Cascade Room 7:00 PM

LOGO A

Aquarius March Meetings

Cascade Room   7:00 PM

  • Tuesday       8th       Engineering firms for 40 Re-certification
  • Thursday    10th       Engineering firms for 40 Re-certification
  • Thursday    17th       BOD Regular Meeting
  • Thursday     24th     Forensic Audit of years 2009 to 2012-  preliminary                                   report   6:00 PM

.o0o.

 

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications | Tagged , , , , | Leave a comment

Water Aerobics and Chair Yoga at Aquarius – Come to have healthy fun!

Water Aerobics and Chair Yoga at Aquarius   –  LOGO LADYCome to have healthy fun!

Invitation to Aquarius Residents

 
Ladies of the Aquarius would like to star up various exercise programs:
 
1. Water Aerobics for one hour once a week. The instructor charges $ 50.00 per hour. This fee would be among those signing up.
 
2. Chair Yoga once a week. The fee is  $ 50.00 to be shared by those participating.
 
Payments collected in a monthly basis in advance. No refunds for missed classes.
 
Sign up at the Management Office. We need a small number to get started. Sometimes these classes fill out fast.
 
If you want get out and have some healthy fun come on and sign up. Try it, you’ll like it.
.o0o.
Posted in Social | Tagged , , , | Leave a comment

Aquarius Lobby and Valet Deck Photos Gallery March 2016

This gallery contains 12 photos.

 Aquarius Lobby and Valet Deck March 2016  Photos Gallery Now we can see the marble of the floor  and the plants in the Valet Deck also. Slides Show  

More Galleries | Tagged , , , , , , , | Leave a comment

Aquarius: January 2016 Financial Report

Logo black no lineAquarius:  January 2016 Financial Report

This is a .pdf  format file that opens in another tab. You may also download it and open it in Adobe Acrobat.

2016 01 31 Aquarius January 2016 Fin Statement

..o0o.

Posted in Finance | Tagged , , , , , , | Leave a comment