Buck Gupta and Cecilio-Augusto Berndsen respond to Mr. Abe Lederman

LOGO LOVEBuck Gupta and Cecilio-Augusto Berndsen respond to Mr. Abe Lederman

January 7, 2017

Abe !

Thanks for your support.  Most of the issues raised in your email have been addressed in Town Hall meetings; however, since you did not receive the information, I will try to address them in the same sequential manner.

The question concerning the voting by unit owners for approving enhancements at the East pool deck has not been presented for approval, pending the finalization of formal drawings being completed by our landscape architect and which are being exhibited in our lobby at this time.  Once the drawings were completed, a cost estimate for various options was generated by our engineer of record and presented to the unit owners in the Town Hall meetings.

A major breakdown by categories for $10,500,000 includes the following:
Replacement of the pool with a new design; replacement of all balconies; new glass railings;  a barbecue area; an outdoor covered patios for the restaurant;  a social gathering area; and a  sitting shaded area for patrons wishing to avoid the direct sun.  Also included in the above-referenced amount is the exterior painting of the buildings, once all the structural repairs have been completed.

The estimated amount of $1,000,000 for the elevators includes providing infra structure necessary for the safe operation of the elevators and meeting the current code requirements. It includes all six (6) elevators in both buildings and a complete replacement of one (1) elevator leading to the Gym  and West pool deck.

The estimate of $ 1,500,000 for hallways renovations includes the replacement of popcorn ceiling , new light fixtures, painting, and replacement of carpets. This scope of work covers all floors for both buildings.

An estimate for professional fees of $ 840,000 is subject to adjustments based on the final construction cost of the project.

As to your final question relative to unit owners having the options to pay principle and interest from day one needs to be worked out with our lender,  since there is no pre-payment penalty associated with our loan.

I do not know if I have answered all your questions.  Hopefully, I have provided you with all the information you requested.

Thanks again for seeking factual information!

Sent from my iPad

Buck Gupta, President of the Board of Directors of Aquarius


January 7, 2017

Dear Abe,

Thanks for asking clarifying questions that may be useful for many other owners.

I think Buck covered your questions very well.

Additional details of the plans may be found in the presentation given to owners in two recent “informational meetings.”

All the slides of the presentation can be seen if you click HERE.  They were posted elsewhere in this blog.

These presentations were prepared and given by Andrew Di Cesare, Engineer of Hillman, Thomas Linbentaun, Principal Architect of LAC and Victor Rocha our Treasurer of the Condominium.

William Coleman, Regional Manager of Atlantic-Pacific was also an active participant in the preparation of the presentation.

Wishing to you and your family a glorious 2017 I hope to see you soon!

Cecilio-Augusto Berndsen, Vice-President of the Board of Aquarius.


January 6, 2017

Hello Buck and Cecilio,
Happy New Year

I first would like to say that I thank you, back and applaud you both for the wonderful, unappreciated work that you both and the rest of the board are doing.
I do have a few questions that I hope either or both of you can answer. The only information that I received was the breakdown of the new assessment. I wasn’t informed of any voting, by the Aquarius owners, for the balcony railings or which configuration the east pool deck was agreed upon. I am assuming that the assessment will be adjusted depending upon the voting.
The next item is the Breakdown letter. There actually is no breakdown.
What does the $10,500,000.00 projected 40-year certification w/improvements involve?
What is the item breakdown to total the $10,500,000.00. Is it the pool area, barbecue area, painting the buildings with one or multiple colors. Balconies, plumbing etc.
You show elevator as $1,000,000.00. Is this for repair or replacement for one elevator or all six?
You have hallway restoration as $1,500,000.00. What will be done? Carpeting? Painting?
Popcorn removal? New light fixtures? Any additional trimming?  Will it include all floors?    Also was the professional fee of $840,000.00 paid or will there be an adjustment when the actual numbers are calculated?

The next item I would like you to consider is to add an additional column which can give everyone an option to pay down the loan which includes principle and interest from day one.
Make Aquarius great again,

Abe Lederman,
Unit 1706N

.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications, Finance | Tagged , , , , , | Leave a comment

Victor Rocha responds to a letter of Mr. Kim

LOGO BLUEVictor Rocha responds to a letter of Mr. Kim

Response to letter from Yulian Kin 803-N

Dear Aquarius Residents,

Yesterday a letter was e-blasted from a resident by the name of Yulian Kin of Unit 803-N. It was interesting to note that the subject matter writing style, syntax and format were almost identical to a letter previously published by the opposition to making Aquarius Beautiful Again. Once again, it’s a false narrative unsupported by facts, science, financial considerations and quite frankly, common sense.

I have a great deal of confidence that our Aquarian owners are very intelligent and as such I found said letter to be an insult to our intelligence. It is noteworthy that whoever is composing these letters, which are replete with outrageous falsehoods and lies, does not even respect the people to whom these lies and falsehoods are directed. At the very least, these folks should come up with a set of lies that have a modicum of truth in order to make them somewhat believable.

I expect to see more of these propaganda style missives in the near future as the election nears. Apparently, these tactics have worked before. Consequently, the folks who have previously used these tactics to their advantage will attempt to use them again. Their objective is not to safeguard and maintain the value of the building. Their goal is to be able to say to all their friends and acquaintances that they live on ocean front property. They fail to take into consideration that the property must be properly maintained and restored.

Please look around my dear residents. The proof is everywhere that the concrete is pulverizing before your very eyes. Aquarius must be restored in the proper fashion as recommended by sound engineering principles and BROWARD county code requirements. Rest assured that the science, the economic advantages and the common sense dictate that all balconies be replaced.

Have a Beautiful Aquarius Day!

Victor E Rocha PA, Treasurer of the Board of Directors of Aquarius
Admitted to Practice Law in Florida, New York and the District of Columbia.

Note from the webmaster: The letter from Mr. Kim is not
 being posted at this time because it was not
 submitted for publication at the site.
 Even as we do not agree with the points 
in that letter we will publish, if submitted to 
publication, and if it is not offensive, 
illegal or otherwise improper.

.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications | Tagged , , , , , | Leave a comment

New Years Evening at Aquarius – Happy 2017

This gallery contains 13 photos.

.  New Years Evening at Aquarius – Happy 2017 everyone! The Aquarius restaurant Aqua Bistro prepared a special New Years celebration party. Many residents had the opportunity to taste delicious food and welcome the New Year with gusto. Check out … Continue reading →

More Galleries | Tagged , , , , , | Leave a comment

Special Assessment 2017 – Slides of the Presentation December 2016

AQUARIUS-3D logo Special Assessment 2017 – Slides of the Presentation of December 2016

These slides were presented at an informational meeting for the owners of the Aquarius Condominium. The presenters were: Messrs. Victor Rocha, Board of Directors Treasurer, Andrew Di Cesare, from Hillman Engineering and Thomas Laubenthal, Principal of Landscape Architect Consultants.

All figures here presented are tentative. Some items do not add to the 15 million dollars of the proposed Special Assessment of 2017 due to a variety of issues. Contracts are under negotiation, some items require Owners approval, cost variance is possible.

It is important to stress two important points:

  1. The Board of Directors is firmly committed to not let the total cost go over the 15 million dollars proposed.
  2. All the numbers are the result of serious diligence. Market surveys, estimates done by consulting experts, solicitation of proposals from vendors of excellent reputation were some of the tools used to put forward a firm, solid and comprehensive proposal. Due to the size and multiple aspects of the several projects, some adjustments are expected.

Special thanks should be given to Messrs. William Coleman, A|P Management Regional Manager and Leonard Finkelberg former Aquarius Cond. Board of Directors member. Mr. Coleman actively worked in securing credit to fund the project as well as have prepared several financial scenarios for the Board of Directors consideration. Mr. Finkelberg worked diligently revising the presentation numbers and indicated several necessary corrections.

Of course, the Board of Directors assumes complete responsibility for any mistakes or omissions of the presentation

If the show of slides does not appear in a clear way it is possible to view it by clicking  here.

.o0o.o0o.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications, Finance, Pictures | Tagged , , , , , , , , , , | 1 Comment

Payment plans for the 40 Year Re-Certification Project of Aquarius – Special Assessment 2017

AQUARIUS-3D logo Payment plans for the 40 Year Re-Certification Project of Aquarius

Special Assessment 2017 

First Payment March 2017

Intro

The purpose of this post is to give the owners a general and approximate idea of what is being studied with great care and with a strong effort to do everything in the best way, according to construction code, and in the most responsible and economic fiscal manner. The interest and safety of the owners of Aquarius is paramount!

What are the plans?  What is the estimated cost? 

This table has best estimate costs that need to be finally determined by the signature of the contracts with firms responsible for the work. Details for the improvements for the East Pool Deck have been presented in previous posts.2016-12-20-project-total-cost

Notes
* 40 Year Re-Certification project includes East Deck, Pool, Balconies with Railings, Sea Wall, Beach Access, Electrical and External Painting. Also included are the Professional Engineering Fees.

†  Mandatory items subject to Board of Directors vote. Some beautification items are subject to Aquarius Condominium Association membership approval as well.

‡ Discretionary items subject to Aquarius Condominium Association membership approval



How is this going to be paid up?

This is the next logical question. Everyone is aware that the Aquarius property needs repairs. The effort is to make this large project affordable by all. The idea is to minimize the hardship and at the same time and get the project completed in the shortest time possible with the minimum inconvenience.
The table bellow represents payment of the Special Assessment over a period of years. These numbers due to software round up are slightly (pennies) different from the official numbers. Take these a estimates only.
2016-12-20-all-nos-subject-change
The interest being charged in the credit line loan contract is of about 4.75% fixed for 17 years (2 years of interest only and 15 years for amortization).

Some owners are interested in a lump sum payment to avoid interest. Studies are being made to accommodate these payments decisions anytime during the payment of the Special Assessment.

Some owners, with excellent credit, are able to get – as individuals – lower rates than the Aquarius Condominium is being charged. It may make sense to borrow from the individual credit institution and pay the Special Assessment in a lump sum. It is a decision each owner must consider. The Association will make every effort to accommodate individual anticipated partial or full payment with the full discount of any future interest to be charged.

At the end of the 24th month, at the end of the project, there will be a “True Up.” It will be verified the total actually used in the credit line to pay for the construction and the balance will start to be paid up. This means capital plus interest.

The numbers in the tables above contains very conservative assumptions: 1) The construction will require the entire loan amount, 2) There will be some bad debt that will use up the contingency reserve, 3) The contingency will be consumed for very expensive unforeseen circumstances, 4) The interest only will be needed for considerable amount of the loan withdrawn at the beginning of the project, 5) Assumption 4) does not allow for any accumulation saved by a lower value utilized in the line of credit. All these conservative assumptions are not likely to occur but they have been considered in the planning to avoid additional charges and project interruptions. The use of careful planing prevents bad surprises down the future.

It must be repeated that these above numbers are assumptions. Final firm numbers will be more realistic after the celebration of the contracts with the General Contractor for the 40 Year Project, for the Elevators rehabilitation contract, for the contracts for the Hallways renovation and other items.

.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications, Finance | Tagged , , , , , , , , | Leave a comment

Aquarius Community End of Year Celebration

LOGO LADYAquarius Community End of Year Celebration

On December 24th, 2016 more than one hundred Aquarius Comunity Members got together to celebrate the Holiday Season.

Sam Schmutter and Sherry Smith conducted the lightning of the Hanukka candles and Pamela Ippolito led the lighting of the Christmas Tree with the reading of a beautiful poem.

Both ceremonies were attentively followed with respect and attention by all present. This including the small ones.

After that, the group went to the Aquarius Green Room to enjoy the dishes and deserts brought up by all families. The potluck had the variety of food that parallels the variety of cultures present in the Aquarius community.

2016-12-24-end-year-celeb-3 2016-12-24-end-year-celeb-4 2016-12-24-end-year-celeb-5 2016-12-24-end-year-celeb-1 2016-12-24-end-year-celeb-2

….

It is very important to recognize ladies from Aquarius that helped the Chair of the Social Committee. Hours and hours of hard work to make everything to flow seamlessly. Our local heroes are:
Sherry Smith, Chair of the Social Committee and Leader of most Aquarius social events.
Pamela Ippolito
Larissa Mitnitsky
Emma Smith
Rita Perchuk
Nancy Arman
Zina Chase
Yvana Berndsen
Luba Finkelberg
Nury Gupta
Angela Perrone

Thank you, thank you for your selfless work. You make life in the Aquarius Condominium brighter.

.o0o.

Posted in Amenities, Pictures, Social | Tagged , , , , , | Leave a comment

Aquarius New Beautiful East Pool Deck

Logo blue girl Aquarius New Beautiful East Pool Deck

2016 2017

This gallery has the most recent renditions of the plans for the East Deck of Aquarius. The stunning proposed East Deck plans are the result of the work of Thomas Laubenthal, RLA. from Landscape Architect Consultants of Plantation, Florida.

These proposal came after several informal meetings with the Construction Committee, Board of Directors and several owners that participated. These vivid gatherings took place in October and November. They were open meetings free to any owner to join. Every participant had a vote. Every participant could address the floor.

Please click in any picture to start the slide show. Need to enlarge the pictures? Read instructions bellow gallery.

 

These Pictures are here posted again. You can use the keys     Crtl and +     (together) to enlarge and be able to verify the details and read the explanations.

pavers-railings-options

Pavers Samples – Similar West Pool Deck

landscape_11-16-16

Landscape Plants

shade-str-options

Shade Structure Options

pool-options

Pool Options

pavilion-bbq-options

Barbecue & Pavilion

pavers_11-16-16

Pavers Samples – Similar West Pool Deck Keeping the Property Standard

Posted in Amenities, Construction & 50 & 40 Year Recertifications, Pictures | Tagged , , , , , , , , , | 1 Comment

Aquarius Condominiun Maintenance Quotas 2017

2017-regular-assessment

Approved November 2016

For a printer friendly table click HERE

 

.o0o.

Posted in Finance | Tagged , , , , | 2 Comments

Elections for the Board of Directors of Aquarius 2017 – List of Candidates

Elections for the Board of Directors of Aquarius 2017 – List of Candidates

The elections will be held on January 21, 2017. Click on the name of the candidates for additional information and plans.  All links open in a new tab.

Cecilio Augusto Berndsen   –  1005 N

Val Boyarsky   – 201 N

Bhagwan Gupta  – 804

Edward Khmelevsky –   506 S

Roman Kisler –   506  N

Robert Leviyev  – 803 S

Judith Ort  –  1605  N 

Victor Rocha  –  1404 N

Linda Satz   –   1108 N

Ches Shostak  –  1404 S

Nusin Shtern   –  408 N

Candidates that wish to have their information posted could send an email to ceciliob@gmail.com.  Acceptable post-able content is MS Word, text, odt, body of email message. Pictures .jpg, .gif, . png.

.pdf and Apple ‘pages’ format can not be posted at this time.

Posted in Board of Directors | Tagged , , , , , | 1 Comment

It’s The Most Wonderful Time Of The Year

logo-capricorn-aquariusIt’s The Most Wonderful Time Of The Year

 

musical-note….It’s The Most Wonderful Time Of The Year
With the kids jingle belling
And everyone telling you “Be of good cheer”
It’s The Most Wonderful Time Of The Yearpink-musical-note-hipink-musical-note-hipink-musical-note-hi
It’s the happiest season of all....

Click hard any picture to start the slides show!

Many thanks for our volunteers that put together the decorations of the Season. Some of them are: Sherry Smith, Wendy Miller, Nury Gupta, Zina Chase, Grace Tomaselli, Angela Perrone.

December 24, 2016, 5:30 PM the Aquarius Community Holiday Celebration  at the Cascade Room.  Bring a dish to share and something to drink. Utensils and water will be provided with Potato Latkes.

Please let Zina Chase  tel.: 954-251-7008     or     Nancy  Di  Maria tel.: 954-923-4540 know what are you bringing to better coordinate the effort.

.o0o.

 

 

Posted in Amenities, Pictures, Social | Tagged , , , | 1 Comment