40 Year Re-Certification Contract with Structural

AQUARIUS-3D logo40 Year Re-Certification of Aquarius:   Contract with Structural

January 17, 2017

Please click HERE for the contract.      2016-01-17-aca-40-yr-const-agreement-structural-1-16-17

Approved by the Board of Directors January 16, 2017.

Addendum and Annexes to the Contract:

2013-01-17-structural-exhibit-a-contractors-bid-form

2016-11-15-structural-aquarius-addendum-3e

2017-01-17-exhibit-c-structural-scope-related-exceptions

Additional relevant pertinent documents are here   – Top Bar of the Blog: 40 YEAR RE-CERTIFICATION AND LANDSCAPE

.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications | Tagged , , , , | Leave a comment

Good Morning Aquarius – Message from Victor Rocha

LOGO SILHOUETTEGood Morning Aquarius – Message from Victor Rocha

Good morning my fellow residents of Aquarius.
I would just like to thank you for having placed your trust in the current members of the board of directors having given us the opportunity to serve you during the past year.
Although we accomplished a great deal, much work is left to be done. My fellow board members and I are ready for the challenge and look forward with great anticipation to the opportunity to serve you once again in the coming year.
We trust that based upon what we have delivered, as we announced yesterday, you will favor us with your vote again so that we can finish the 40 year certification and complete our goal of restoring Aquarius as the bright jewel by the sea that it once was and was always intended to be.
Thank you once again for your votes.
Have a very Beautiful Day
Victor E Rocha
Aquarius Board of Directors Treasurer
.o0o.
Posted in Board of Directors, Social | Tagged , , , , , , | Leave a comment

When is the Gym going to Open Again? Soon!

LOGO LADYWhen is the Gym going to Open Again? Soon!

The Gym bathrooms are practically done. Aquarius Condo. got a verbal approval of the project from the Inspector of the City of Hollywood.

We expect the construction permit to close very soon.

What’s next? Members of the Board, Members of the Construction Committee, Owners in General and of course Mr. Gym Harry Smith have been active inspecting the work and finding small repairs that need to be done before we open the Gym. If you have a suggestion please send an email to David Slavin  dslavin@apmanagement.net    or leave a note at the Front Desk or at the Management Office. We need to have this punch list ready ASAP.

Also, it will be required to perform a complete evaluation, lubrication and tune-up of all equipment that has been stored and has been with no use during all this period of construction.

If were not for some Out-of-Code items such us improper electrical network, pipes of PVC when the Code specifies  Cast Iron we could have had the Gym reopened a month before.

We are sure that the wait was worth. We now have a great Gym with Bathroom to the level that is expected in a building like our Aquarius.

.o0o.

Posted in Construction & 50 & 40 Year Recertifications | Leave a comment

Is the aquariusuno.com blog made of fake news?

Logo blue girlIs the aquariusuno.com blog made of fake news?

 

I got a number of phone calls from friends and supporters of the Aquarius Condominium. They were very upset with a paragraph in a document “A Few Points to consider before the Aquarius Elections”

This document, prepared by the opposition to the current Board of Directors, is full of untruths, not based on reality and shows that the opposition does not have the interests of the Aquarius community in high regard.

Most of the falsehoods were properly addressed in a response prepared by Victor Rocha, Board of Directors Treasurer in a document also posted in this blog.

The individuals that called me were especially upset with mention that this blog spreads out fake news. They demanded a response to the false accusation.

All comments are open to anyone and always approved as the documents, pictures or materials I have been asked to post have always been posted.

The blog cannot post material that has not been submitted. If one does not submit the material he or she will not get published. I have no ability to post materials that have not been submitted and ordered to be posted.

Where are the fake news? Maybe the expression was borrowed from the media and not correctly understood. The opposition certainly has emailed fake news with no factual, scientific or engineering support.

But I do have some interesting “news”:

One candidate states in the biographical information that he finished the West Pool Deck. The Deck was opened 9 months after he left the Board and did not have lights and several details that were not completed until the end of 2015.

There are candidates that did not bother to present their biographical information with their experience that could help us to evaluate if they are up to the complex task of being a Board Member.

No need to say that even being offered to present their biographical information and photographs they did not have the interest or the time to do so. Is this fake news or is this negligence by members of the opposition? But since some did not even submit their information to be distributed with the electoral material I can only assume that they are not interested in getting to be known by the community.

Another interesting point about fakeness is to run for the Board and then run out of town. It seems that even those opposition candidates that are full-time residents did not have the time or interest to participate in the presentations, seminars, Board Meetings, Construction Committee Meetings regularly held. It is surprising the sudden interest in Aquarius business after one year of total absence.

The bottom line is: the blog is open if the document is not offensive, illegal or disruptive. The information will be published. But it will not automatically post.  Someone has to ask for posting and be responsible for its content.

In the two years of the blog no one has had his/her material refused. Even when sometimes – to me – it seems that the content is a bit far away from reality.

 

Cecilio Augusto F. Berndsen   Blogger of aquariusuno.com, Member of the Board of Directors and proud Candidate for the Board of the Aquarius Condominium, term of 2017.

.o0o.

 

Posted in Board of Directors, Social | Tagged , , , , , | Leave a comment

Work Done: A List of Projects Completed in 2016

LOGO AA List of Projects Completed Under the Auspices of Current Board of 2016:

Let this team finish the work they started.

Vote for: Buck Gupta, Cecílio A. Berndsen, Linda Satz, Victor Rocha and Judy Ort.

They live here, they work hard, they believe in the Law, they listen to competent Technical Experts, they let you know what is going on, they do not make up false allegations or facts in order to get elected, their work and their decisions are supported by actual facts, correct engineering principles and sound economic and financial policies. They do not use scare tactics, they give the building continuity and harmony. 

 This Board is a good reflection of the Aquarius Community: All American Citizens,  Latinos, East Europeans, Hindu, Caucasians, Jews, Christians, Agnostics, Republicans, Democrats. All of them working in harmony with a single interest: To bring the best to Aquarius.

Vote for the full time residents of the BOARD.


Partial List of Accomplishments      

  1.  Completion of the Lobby area, including the Cascade Room, Green Room, Library/Media Room, and the Billiard/Game Room;
  2.  Completion of the Valet Deck, including the lighting on the upper parking lot and lower garage to close out the permit;
  1.  Completion of the landscaping plan to close out the permit;
  1. Acquisition of the vertical-link and Galaxy software system to provide the automatic system for securing entrances to both towers, creating data bases for registering FOBS and registering automobiles for our unit owners;
  1. Installation of A/C units to cool hallways in both towers;
  1. Replacing A/C unit in the Billiard/Game Room;
  1. Securing operating permits for all of our elevators, once the necessary code compliance issues were cleared on a temporary basis;
  1. Closing out all open permits for work completed without pulling permits, or failure to call for inspections, as required, on an ongoing basis;
  1. Installation of additional security cameras to improve safety and security for our patrons and visitors;
  2. Installation of a new roof at the Gymnasium;
  3. Correction of code violations for electrical and plumbing issues in the Green Room ceiling and in the Gymnasium;
  1. Installation of electrical grounding for the East Pool, where none existed, posing a serious life-safety issue for keeping the pool open for the use by our patrons;
  1.  Replacement of the electrical wiring responsible for the operations of the elevators in the North Tower and a similar situation in the South Tower;
  1. Total renovation of men’s and women’s bathroom facilities in the Gymnasium;
  1. Lobby, Hallways elevators – marble restoration   (neglected for several years);
  1. Library: organized with the mobilization of the community more than a thousand titles available – zero cost to the association;
  1. Sound systems: Lobby, Green Room, Alcove Bar/kitchen installed;
  1. Sound system: Cascade Room system AV capable with new microphones;
  1. Library and Conference Room 4K UD Large size TV installed, Library projector to accommodate 40+ residents. Conference Room to accommodate 12 residents;
  1. New Lease with a very successful and tasty Restaurant Aqua Bistro;
  1. New Lease with very successful Beauty Salon;
  1. Front Lawn lights; Storage Rooms have new floor stain resistant paint (neglected for more than 10 years);
  1. Re-organization of Recycling Program of the Building with additional Recycling bins;
  1. WI-FI network with very good service on East Pool Deck Gym Lobby, Library, Cascade Room and Game-Room. West Deck Wi-Fi under repair;
  1. Secured a very favorable 4.75% up to $15 Million Dollar loan to be able to pay for 40-year Certification re-construction;
  1. Executed 40-year Certification Construction contract with a highly qualified Construction firm, State Licensed and Insured, specializing in concrete restoration projects;

Studies, Preparation and Planning:

  • 40 Year Re-Certification: retained a Florida State Licensed, Insured and Experienced in concrete restoration top-notch firm (Hillman recruited among 6 firms through a competitive bidding process);
  • 40 Year Recertification: explored new face lift for East Deck hiring Tom Laubenthal after consulting approximately 8 Landscape firms;
  • Elevators renewal plan – in progress with Professional Technical Assistance; competitive process under way after serious evaluation of the elevators systems.
  • Cascade Room and Restaurant Air Conditioning renewal. Studies in progress;
  • Front Lawn lights – first phase concluded, second phase under progress;
  • Hallways Renovation: Paint, floors and lights. With already three proposals in hand the Board has a firm benchmark to estimate the cost of this initiative (1.5 million). The renovation, of course is going to be submitted to membership approval.

____________________________________________________

Aquariuscondo.net   Official site of the Aquarius Condominium

Aquariusuno.com    Independent blog of the Aquarius Condominium

.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications | Tagged , , , , , , , | Leave a comment

A Note from the Aquarius Board Treasurer January 15, 2017

AQUARIUS-3D logo A Note from the Aquarius Board Treasurer

Sunday, January 15, 2017

 

Board  Treasurer Comments on the Latest Propaganda by Opposition

 

Good Day Aquarians! It is another Beautiful Day!

 

Yesterday, the opposition sent out another missive accusing the current board of lying to you about the current need to complete the 40-year Re-Certification. It is the same false narrative and rhetoric that they have been spewing for weeks. These are the people who have gone a long way towards causing the unnecessary decay to our buildings by using band-aid approaches, failing to do the proper maintenance of the building, doing illegal work without the proper permits to assure that the work is being done according to South Florida Building Code Requirements, wasting the Trump money by using it to defray maintenance costs, failing to close out permits that were obtained in order to do work and the list goes on. These folks, some of which are running for the board, are telling you that there is nothing wrong with the building and that the balconies are fine. 25 out of 26 concrete core samples failed the compressive strength tests. The report from Batista that they allude to was based upon a cursory visual inspection by that engineer who only spent a few hours at Aquarius and he concluded, based upon what he could see that the balconies were in need of repair. He did not do the core samples so he had no way of knowing the enormity of the concrete failure rate, which was subsequently supported by the findings of an independent lab, RAS.  Based upon such a high failure rate, it is actually cheaper to remove and replace the balconies than to patch them, as the labor rate would exponentially increase the price. Moreover, we would be doing it again in 10 years when the 50-year certification is due, and the un-repaired concrete would have continued to deteriorate and would have to be repaired again. IT IS THE OPPOSITION THAT IS LYING TO YOU.

The current Board did not hand-pick the engineering firm. As you may recall, we had several presentations to our membership of at least 6 highly competent engineering firms who specialize in concrete restoration work. There may be only 10 firms in the area that do that. 6 chose to participate. Based upon their presentations and based upon the bids, your board selected Hillman. The scope of work was not defined by Hillman. The scope of work is defined by the condition of the building that your previous boards allowed to deteriorate. Remember as a small example, our Aquarius Buildings have not been painted in at least 10 years? Is that responsible stewardship of such a precious jewel on the sea? I’m going to with NO on that!! ANOTHER LIE BY THE OPPOSITION.

This Board is NOT misleading the membership with regard to any aspect of the 40-year certification. The current board is the most transparent and informative board that this member has ever seen. We have advised the membership through monthly board meetings, weekly construction meetings, presentations by engineers and contractors and notices posted in conspicuous places as to everything this Board has done. None of the other candidates who are currently running against this Board, especially those who have served before have ever accomplished as much as this Board and performed with such utter transparency while keeping the membership fully informed of its activities and decisions. The basic reconstruction has to be done. There is no choice about that. If the membership wants the added enhancements, which will cost approximately 8-9% more, they will certainly have a right to vote on the enhancements, which will not be done unless two-thirds of the membership approves it. However, as illustrated by price comparisons of recent sales of beach condos who have added glass balconies and other improvements, the price per square foot of Aquarius should go up between 50-60%. This is your choice. THIS IS PROVEN BY RESEARCH OF RECENT CONDO SALES ON HOLLYWOOD BEACH. CHECK WITH BROWARD COUNTY PROPERTY APPRAISER’S OFFICE.

The opposition letter further goes on to mislead our membership by maligning the current board which has worked in good faith for the betterment of our community. The project will last 2 years, not 5 years. There are penalty clauses in the construction contract to prevent that. YET ANOTHER HUGE LIE BY THE OPPOSITION.

The project will not cost 30% more with overruns and changes. This is what previous boards did. The contracts have been designed and the engineers are in place to ensure that there are not changes which increase costs, in fact, the contract is designed in such way as to be over-inclusive. Consequently, our hope is that if any changes need to be made, these changes would scale down the work and result in cost decreases. THAT ONE WAS A WHOPPER, ONCE AGAIN UNSUPPORTED BY ANY FACTS.

Your units will be habitable. However, there will be some inconvenience. What the opposition appears to be proposing is, Let’s not do the 40-year Re-Certification which is required by law so that “I” will not be inconvenienced. This is a very self-centered and selfish point of view. A COMPLETE FABRICATION AND SCARE TACTIC.

The price of your unit will increase by 50-60% with the enhancements. The value of your unit will not decrease!! Talk about using scare tactics. At least try to come up with some support for the negative argument. Once again, this is a false narrative and nothing but propaganda that is unsupported by any fact.

The structural integrity of the building will not be diminished. The Structural engineers who have great insurance and are putting their licenses on the line have done this multiple times over the last 40 years and there has not been one report of finishing the structural integrity of a building. WHO IS LYING? THE OPPOSITION.

The majority of the necessary repairs are not elective. They are mandated by Florida law and the South Florida Building Code. Actually the Board owes a Fiduciary Responsibility to the membership to perform the repairs or replacements necessary to abide by the law. ONLY 8 to 9% of the costs, if approved by the membership, are for electives. At least 10 to 10.5 Million are required for the basic 40 year Certification. YET ANOTHER LIE BY THE OPPOSITION UNSUPPORTED BY ANY FACTS.

Victor E. Rocha, Treasurer of Board of Directors of Aquarius

 

.o0o.

 

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications | Tagged , , , , , , , | Leave a comment

Letter from Aquarius Owner Paul Wilk January 15, 2017

LOGO LOVELetter from Aquarius Owner Paul Wilk   January 15, 2017

 

I would like to take this opportunity to say “Thank You ” to the current Board of Directors of The Aquarius Condo Association for their due diligence & efforts to bring the Aquarius back from the rubbles of the past to a bright & new potential future. This can only be achieved by hard work, & unselfishly giving up personal time & energy of each & every Board member to work diligently towards the mutual goal of making the “Aquarius Great Again.” I am kindly asking every unit owner to look deep in their minds & souls to re-elect the current Board Members. We have come so far & yet have so much farther to go.

However, the time, money & effort will surely be rewarded many times over. Please do not be shortsighted & think about the assessment as a negative, instead realize it’s the beginning of a bright new future for all of us at the Beautiful Aquarius.The pot of gold is there at the end of the rainbow to all that have the foresight & vision of the future.

Please choose wisely as this may be the most important financial decision you will make in 2017.

Thank you,

Kind regards,

Paul Wilk,   204-N

.o0o.

Posted in Uncategorized | Leave a comment

Be Careful with your vote for the Board of Directors

LOGO BLUEBe Careful with your vote for the Board of Directors

The 2017 Board of Directors election is only days away.   As unit owners we  have the responsibility and the great privilege of electing the next Board of Directors of Aquarius.

The election ballots were mailed to all the unit owners and must be handled with care in order to be counted. Please secure your vote by making sure that the ballot is received in the management office by your hand only.  You must deliver your ballot to the office in person. If you are unable to do so, then your ballot may be delivered through a proxy you designate in writing or by U.S. mail from the secondary address listed with the management office.  Make sure that your vote counts by adhering to this simple but very important rule.

Election day is January 17, 2017.  Make your vote count.   Follow the rules!

Judith Ort, Member of the Board of Directors of Aquarius

Posted in Board of Directors | Tagged , , , , , | 1 Comment

Message from the President of the Board of Aquarius

 AQUARIUS-3D logoMessage from the President of the Board

January 13, 2017

Dear Unit Owners,

Last night, your Board took the first step forward by securing a loan from the Bank, as well as passing a motion to assess ourselves to provide funding to pay off the loan.

You heard from some owners promising you a free lunch.  A question was raised as to why we do not have a signed contract to complete the project.  It is well known that a contractor is never hired without having the money to pay for the services to be rendered.

Your current Board is not taking your support for granted.  We must proceed in an orderly fashion.  We are currently in the process of negotiating a contract with the final unit prices for identified scope of work to include all enhancements.  It is much easier to reduce the scope of work and corresponding costs associated with it, then to add items with change orders for higher prices.  Once the unit owners vote and approve the enhancements to have our property brought up to date, we will have a safe and enticing place call “home” and protect our investment for years to come.

At this time, we have the opportunity to elect Board members who would carry out the necessary work to complete the project in a timely fashion without making false promises, or go back to a Board who has not delivered in the past and would only serve the interest of selected few.

It is your choice.

Bhagwan (Buck) Gupta

.o0o.

Posted in Board of Directors, Construction & 50 & 40 Year Recertifications | Tagged , , , , , , , , | Leave a comment

Facts about the balconies of Aquarius

Logo blue girlFacts about the balconies of Aquarius

 

It seems the questions about the need to replace the Aquarius Condo keep popping up.

Not the recent reports from ACG, Baptista and Hillman seem good enough. It is also important to point out that since 2009 we have had several other studies all point out the need to immediate address the balconies. This is just a sample of studies, evaluations, and professional opinions. The Aquarius Condominium pays for all this but it fails to act.

Click here for ACG 2014 report. The cover letter is a fair warning.

Click here for Gregorio Batista Structural Report 2015-2016. Many areas require immediate attention. * seen note on bottom

Click here for Hillman report 2016  – please be patient comprehensive report downloads slowly.

Click here for Concrete Compression Resistance Test of 26 balconies

Click here for original specifications of Aquarius Building construction of 1972 with a letter from Property Manager to Owner challenging facts. Facts about the Aquarius Balconies.

It is also of value to review the 2015 balconies repair effort. A contract with the total value of about $90.000 (nine thousand dollars) had been signed in late 2014. The scope was to repair about 36 balconies that required urgent attention. After some of the target for repair had to be totally replaced the work was suspended by the 2015 Board.  Bottom line: of the 36 balconies only 4 were fixed, some of them completely replaced and the Aquarius Condo had spent half of the budgeted allowance for this contract.

Should we travel the same road again? When the original concrete resistance should be of 4000 psi and 25 out 26 balconies show a resistance of under 1900 psi?

Another interesting question is: Why spend money on partial repairs joining 44 years old decrepit concrete with new concrete? The resistance of the old concrete is bellow code. Even if it is apparently good there is no guarantee that in two or three-year it will require attention again.

The time to act is now. Without your support nothing will be done.

Insanity: doing the same thing over and over again and expecting different results.                      Albert Einstein