Aquarius Lobby Detailed Renovation Proposal and Contract July 2015

aquarius-285x300Aquarius Lobby Detailed Renovation Proposal and Contract      

 July 20 2015

Contract in pdf format file, click here>        2015 07 20 Signed_lobby_contract

Other relevant  links :

Lobby Blue Print Proposal – Beautification Committee Meeting of May 15

Lobby and Adjoining Areas  INTERIOR RENOVATION – SCOPE OF WORK  June 11

 

 Contract Proposal:

OAK GROUP INC.
DBA IMAGINE REPAIR & RENOVATIONS INC.
2497 NW 64TH STREET, BOCA RATON, FL 33496
JEFF SNYDER 561-866-1436
CLISNYDER2497@AOLCOM

________________________________________________________

CONTRACT PROPOSAL
AQUARIUS CONDOMINIUM • 2751 S. OCEAN DRIVE, HOLLYWOOD, FL.
JUNE 15, 2015
EXHIBIT A

_______________________________________________________

LIBRARY — CONVERT TO PACKAGE/COMPUTER AREA:

1. S & I solid core door and jamb 3′-0″ x 8′-8″.
2. Remove window, stud out remaining wall and apply 5/8″ fire-rated drywall with insulation.
3. S & I keyed lock.
4. Install ‘/2 wall separating Package area from Computer area.
5. S & I suspended acoustic ceiling.
6. Skim walls to paint ready condition.
7. Apply 2 coats Ben. Moore/Sherwin Williams Premium paint to all interior walls (color to be selected)
8. S & I (3) duplex outlets in Computer area. Any additional receptacles for Computer area Including dedicated circuits (TBD) at additional cost.                                              $5,484.00

CONFERENCE ROOM:

1. install new 5/8″ drywall ceiling and repair existing ceiling as needed.
2. Skim ceiling areas as necessary to paint ready condition. Apply 2 coats of Benjamin Moore Or Sherwin Williams Premium paint to ceiling areas as per Designer’s specifications    (2 – 3 colors).
3. Remove existing wallcovering. Repair walls as needed for paint or wallcovering (by others). Prime And apply 2 coats of Benjamin Moore or Sherwin Williams Premium paints to walls and soffits as Per Designer’s specifications.
4. Refinish wooden walls and door.
5. S & I new wood baseboard, finish to match adjacent wood walls/door.
6. Replace existing NC diffuser grills.
7. S & I recessed LED 4″ lighting fixtures (Qty: 10 type B )
8. S & I cove lighting on two side walls with LED light strips.
9. Install Client’s hanging lighting fixture.

$11,679.00
PAGE 1

LOBBY/MAIN HALL (to Cascade & Green Room):

1. Cover all marble flooring during construction phase with masonite.
2. Remove existing ceiling suspended metal stud framing in Lobby/Main
Hall including acoustic tile ceiling in hall outside Board Room.
3. S & I insulation and 5/81 drywall to all exposed metal stud walls. Tape & triple skim to smooth finish.
4. Prime all walls for vinyl microvented wallcovering,
5. S & I ceiling stud system on 16″ centers.
6. S & I 5/8″ fire-rated drywall on ceiling.
7. Create 3 coffered ceilings in main hall: 2 square with two step up, 1 rectangle with one step up
8. Triple skim ceiling and coffered ceilings to paint-ready condition and prime.
9. Apply 2 to 3 coats of ceiling paint to entire lobby ceiling including existing 4 circular and 3 new coffers. (Additional decorative finish to round coffers by others)
10. S & I recessed LED lighting fixtures (Qty: 90)
11. S & I (2) +1-13′-3″w x 7′-6″h wall mirror as per Designers elevations.
12. S &I new door and wood casing on valet area with wood veneer door to match reception desk. Door style and stain color by Designer. Remove secondary valet door & casing. Close opening with Drywall to create niche per design drawing. Niche fabrication with cabinetry by others.
13. Create drapery pocket in front of hall windows.
14. Create cove for concealed LED strip lighting along wall above Aquarius wall mural.

$83,457.00

CASCADE ROOM:

.
1. Remove popcorn ceilings and triple skim to paint ready condition.
2. Prime all walls and ceilings.
3. Paint all walls and ceilings with 2 coats of Benjamin Moore or Sherwin Williams Premium Paint, eggshell finish on walls, and flat finish for ceilings. Paint all wood trim work semi-gloss or pearl oil base. Paint selections as per Designers elevations/paint schedule.
4. Refinish wood finished doors and casing (2 pairs and 1 single). Stain color to be determined.
5. S & 1 (30) 6″ recessed LED fixtures (Type A) and new a/c grills to replace existing.

$19,312.00

LOBBY BATHROOMS (2):

 

1. Remove and dispose of all existing plumbing fixtures, stall partitions, cabinetry, lighting/soffits, floor tile and baseboard, bathroom accessories and wallpaper.
2. Remove door openings between Womens’ lounge and bathroom, enlarge opening to 36″Wx 80″H. Enlarge opening in Mens’ bathroom between vanity area and toilets to 36″ min as well.
3. Remove 30″W entry doors and casing in both bathrooms. S & I new solid core flush paint grade 36″W x 80″H x 1 3/4″th. doors, jambs and casing. Paint color to be determined.
4. Create one ADA toilet enclosure in each bathroom and one regular toilet stall in Womens WC with new laminate bathroom partitions (selections by Designer).

PAGE 2

LOBBY BATHROOMS (2) CONTINUED:

.
5. S &I per bathroom two ADA toilets and one ADA wall mt lavatory and 2 grab bars in each ADA stall.
6. S & I two wall mount urinals in Mens.
7. S & I granite or quartz countertops with 4″ high backsplashes (to be selected) up to $40 per sf Included in proposal for two undermount lavatories on ADA designed floating vanity (no drawers).
8. S & I granite or quartz countertop with floating cabinetry below for women’s makeup area (no drawers).
9. S & I porcelain tile floors in both bathrooms as selected: 20″ x 20″ Statuary porcelain and 12″ x 24″ Black “marble” look porcelain cut into borders and baseboard.
10. Patch and repair existing drywall ceilings or add new 5/8″ drywall on ceilings where necessary.
11. S & I recessed LED lighting fixtures (22 in total). Lighting plans to be furnished by Designer.
12. Triple skim walls and ceilings to paint ready condition and prime.
13. Prime Womens lounge area for vinyl wallcovering (by others). Apply 2 coats Benjamin Moore or Sherwin Williams Premium Paint to all other walls and ceilings in both bathrooms.
14. S & I two sconce outlets in Womens’ Lounge makeup area.
15. All plumbing, labor, materials to code.

$35,211.00

GREEN ROOM:

.
1. Remove popcorn and repair ceilings.
2. Triple skim to paint ready condition and prime.
3. Apply 2 coats Benjamin Moore Premium or Sherwin Williams paint to walls and ceilings. Latex eggshell for walls, ceilings latex flat and all trim in semi-gloss/pearl oil. Paint colors by Designer.
4. S & I 5/8″ drywall ceiling to replace suspended acoustic tile ceiling.
5. S & I 30 recessed LED (4″ type B — insulated housing) lighting fixtures.
6. Optional wall prep for 2 main walls only if vinyl walicovering selected.

$21,546.00

LOUNGE, LIBRARY/MEDIA ROOM & HALL/WC TO BAR:

.
1. Conceal wood paneling and brick tile entrances with 5/8″ drywall in both rooms. Retain existing arched entryway motif.
2. Install only two sconces in Library niche area.

PAGE 3

LOUNGE, LIBRARY/MEDIA ROOM & HALL/WC TO BAR (CONTINUED):

.
3. S & I recessed 4″ LED light fixtures in Lounge and Library (Qty: 30). Designer to verify location Of fixtures. Add 3 fixtures in each of two niches in front of proposed new wall-to-wall book shelves.
4. Remove popcorn finish on ceilings, repair soffit ceilings as necessary, and triple skim to paint-ready condition on ceilings and soffits.
5. Apply 2 coats of Benjamin Moore Premium or Sherwin Williams Paint on Ceilings and walls.
Color(s) to be selected by Designer.
6. S & I two ceiling fans and new a/c grills.
7. S & I two bookcase units, one per niche, each 101W x 82″h (full height) divided in 3 sections.
8. S & I (3) duplex outlets in plinth of each bookcase unit for a total of 6 outlets.
9. Remove existing vinyl flooring in hallway to Bar and small bathroom (at end of hall). Install new 20″ x 20″ Statuary Porcelain Tile (same as Lobby bathrooms) in hallway with new painted
wood baseboard in hall and matching tile baseboard in bathroom.
10. Skim, prime and paint walls of hallway with 2 coats of Benjamin Moore or Sherwin Williams Premium paint.
11. S & I new 6″ LED recessed fixtures in hallway. Qty: 4 Ceiling to remain as is.

$36,253.00

PERMITS:

All applicable permits and sealed drawings to the City of Hollywood, Florida including: Electrical, Plumbing, Mechanical and Structural.

$1 1,000.00

TRASH DISPOSAL:

Dumpster service for approx. 12 weeks.                                                                   $3,000.00

TOTAL:                                                                                                               $226,942.00

PAGE 4

determined.
5. S & 1 (30) 6″ recessed LED fixtures (Type A) and new a/c grills to replace existing.
LOBBY BATHROOMS (2): $19,312.00

1. Remove and dispose of all existing plumbing fixtures, stall partitions, cabinetry, lighting/soffits, floor tile and baseboard, bathroom accessories and wallpaper.
2. Remove door openings between Womens’ lounge and bathroom, enlarge opening to 36″Wx 80″H. Enlarge opening in Mens’ bathroom between vanity area and toilets to 36″ min as well.
3. Remove 30″W entry doors and casing in both bathrooms. S & I new solid core flush paint grade 36″W x 80″H x 1 3/4″th. doors, jambs and casing. Paint color to be determined.
4. Create one ADA toilet enclosure in each bathroom and one regular toilet stall in Womens WC with new laminate bathroom partitions (selections by Designer).

PAGE 2

LOBBY BATHROOMS (2) CONTINUED:

.
5. S &I per bathroom two ADA toilets and one ADA wall mt lavatory and 2 grab bars in each ADA stall.
6. S & I two wall mount urinals in Mens.
7. S & I granite or quartz countertops with 4″ high backsplashes (to be selected) up to $40 per sf Included in proposal for two undermount lavatories on ADA designed floating vanity (no drawers).
8. S & I granite or quartz countertop with floating cabinetry below for women’s makeup area (no drawers).
9. S & I porcelain tile floors in both bathrooms as selected: 20″ x 20″ Statuary porcelain and 12″ x 24″ Black “marble” look porcelain cut into borders and baseboard.
10. Patch and repair existing drywall ceilings or add new 5/8″ drywall on ceilings where necessary.
11. S & I recessed LED lighting fixtures (22 in total). Lighting plans to be furnished by Designer.
12. Triple skim walls and ceilings to paint ready condition and prime.
13. Prime Womens lounge area for vinyl wallcovering (by others). Apply 2 coats Benjamin Moore or Sherwin Williams Premium Paint to all other walls and ceilings in both bathrooms.
14. S & I two sconce outlets in Womens’ Lounge makeup area.
15. All plumbing, labor, materials to code.

$35,211.00
GREEN ROOM:
1. Remove popcorn and repair ceilings.
2. Triple skim to paint ready condition and prime.
3. Apply 2 coats Benjamin Moore Premium or Sherwin Williams paint to walls and ceilings. Latex eggshell for walls, ceilings latex flat and all trim in semi-gloss/pearl oil. Paint colors by Designer.
4. S & I 5/8″ drywall ceiling to replace suspended acoustic tile ceiling.
5. S & I 30 recessed LED (4″ type B — insulated housing) lighting fixtures.
6. Optional wall prep for 2 main walls only if vinyl walicovering selected. $21,546.00

LOUNGE, LIBRARY/MEDIA ROOM & HALL/1111C TO BAR:
1. Conceal wood paneling and brick tile entrances with 5/8″ drywall in both rooms. Retain existing arched entryway motif.
2. Install only two sconces in Library niche area.

PAGE 3

LOUNGE, LIBRARY/MEDIA ROOM & HALLIWC TO BAR (CONTINUED):
3. S & I recessed 4″ LED light fixtures in Lounge and Library (Qty: 30). Designer to verify location Of fixtures. Add 3 fixtures in each of two niches in front of proposed new wall-to-wall book shelves.
4. Remove popcorn finish on ceilings, repair soffit ceilings as necessary, and triple skim to paint-ready condition on ceilings and soffits.
5. Apply 2 coats of Benjamin Moore Premium or Sherwin Williams Paint on Ceilings and walls.
Color(s) to be selected by Designer.
6. S & I two ceiling fans and new a/c grills.
7. S & I two bookcase units, one per niche, each 101W x 82″h (full height) divided in 3 sections.
8. S & I (3) duplex outlets in plinth of each bookcase unit for a total of 6 outlets.
9. Remove existing vinyl flooring in hallway to Bar and small bathroom (at end of hall). Install new 20″ x 20″ Statuary Porcelain Tile (same as Lobby bathrooms) in hallway with new painted
wood baseboard in hall and matching tile baseboard in bathroom.
10. Skim, prime and paint walls of hallway with 2 coats of Benjamin Moore or Sherwin Williams
Premium paint.
11. S & I new 6″ LED recessed fixtures in hallway. Qty: 4 Ceiling to remain as is. $36,253.00
PERMITS:
All applicable permits and sealed drawings to the City of Hollywood Florida including: Electrical,
Plumbing, Mechanical and Structural. $1 1,000.00
TRASH DISPOSAL:
Dumpster service for approx. 12 weeks. $3,000.00
TOTAL: $226,942.00

PAGE 4

 

This entry was posted in Construction & 40 Year Inspection and tagged , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s