Hollywood Beach Nourishment Project in Full Blown

Hollywood Beach Nourishment Project in Full Blown

As announced early December the beach sand strip Aquarians enjoy year round was going to be enlarged.

The beach nourishment project is advancing in a fast pace. A few pictures serve to document the job. By March the project should be done.

Now we have increased protection from ocean surge and a greater space to enjoy the sun. Congratulations!

Click any picture and start the slides show, use arrows or click image to move to next photo.

January 13, 2018. With the job completed in front of Aquarius a few residents enjoy the sun and the additional space in the sand.    The South portion of the project should improve the beach up to the South  border of the City of Hollywood

Previous post in this blog with technical highlights and pictorial details of the project

Hollywood Truck Haul Project Information Sheet

Thanks to Mr. Waszak for providing information on the project.

John Waszak,  Engineering Technician, ATM Design Engineering Consulting1 - ATM Final Logo new 7-7-17

.o0o.

About Cecilio Augusto Berndsen

Information Technology, Management, Project Management and Public Administration are areas I am familiar with. I am also interested in photography, wine, sailing, politics, economics, and economic development.
This entry was posted in Amenities, Construction & 40 Year Inspection, News from Around and Beyond, Pictures and tagged , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s