Is there a crane in Aquarius future?
A new central Air Conditioning system is being installed at Aquarius. This system will provide climate control for both Aquarius towers. It replace the old system and will provide fewer interruptions, more comfort in building hallways and less repairs.
The replacement is a complex operation that will require a crane to place the heavy equipment in the top of both buildings. During this replacement the hallways will have no air conditioning. The air conditioning in individual apartments are not affected.
The work schedule is from June 13 to mid July. No air conditioning in the hallways should last for two weeks.
Vmech is the firm conducting the work.
The sacrifice is will pay of.
.o0o.