Is there a crane in Aquarius future?

Is there a crane in Aquarius future?

A new central Air Conditioning system is being installed at Aquarius. This system will Liebherr-MOBILE-CRANEprovide climate control for both Aquarius towers. It replace the old system and will provide fewer interruptions, more comfort in building hallways and less repairs.

20160529 crane 1

 

The replacement is a complex operation that will require a crane to place the heavy equipment in the top of both buildings. During this replacement the hallways will have no air conditioning. The air conditioning in individual apartments are not affected.

The work schedule is from June 13 to mid July. No air conditioning in the hallways should last for two weeks.

Vmech is the firm conducting the work.

The sacrifice is will pay of.

 

.o0o.

 

About Cecilio Augusto Berndsen

Information Technology, Management, Project Management and Public Administration are areas I am familiar with. I am also interested in photography, wine, sailing, politics, economics, and economic development.
This entry was posted in Construction & 40 Year Inspection, Contracts. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s