Improving Aquarius and Avoiding Deterioration – Third Floor
Over the past month, we have been documenting opportunities to improve the Aquarius building, prevent future inconveniences, and avoid costly repairs.
Lists of recommended items for the Ground Floor (November 11th) and the Lobby Level (November 19th) were shared for this purpose. This communication presents a follow-up list for the Third Floor.
To date, it appears that none of the previously identified items have been addressed. Given that the approved maintenance budget for the coming year is sufficient—and was even accompanied by a reduction in regular assessments—we trust the Management and Board will now prioritize these actionable items.
We hope for your prompt attention to the following issues on the Third Floor:
Deficiencies & Required Improvements: Third Floor of Aquarius
1. Pool Lighting Deterioration
-
The original LED color-changing lights in the West Pool were replaced with standard white lights, reducing the aesthetic appeal and intended ambiance.
2. Structural & Surface Maintenance
-
West Pool Bathroom Door: The door is rusting and requires sanding and repainting to prevent further corrosion.

-
GYM 50-Year Recertification: The project remains incomplete after over a year. Notably, concrete restoration on the Northeast side appears to have been neglected.
-
North Tower West Side: Work was signed off as complete, but several wood pieces remain attached, and the paint job requires touch-ups in multiple areas.

-
Concrete Beams: The beams adjacent to the Gym building and in the Valet deck area were inadequately painted. All surfaces, including the tops of the beams, require proper painting.

3. Furniture & Amenities
-
Pool Deck Tables: The round stone tables on the deck appear abandoned without accompanying benches, making them unusable.

-
West Pool Heater: The unit is not functioning properly and requires repair or servicing.
4. Cleaning & Preventative Upkeep
-
Pavers: Numerous pavers show significant mold and mildew growth. Professional cleaning is urgently needed to prevent slip hazards and material degradation.